Beginning the week of January 4th, the District’s operator and their subcontractors will begin work to repair the side slope erosion at Alcorn Lake. The repairs will take between two and three weeks, weather permitting.
Expect construction traffic accessing District property in the 5000 block of Avondale Dr. at the south and west sides of Alcorn Lake during this time.
For more information on the method of repair please visit https://www.soxerosion.com/services/shoresox.